Description
The NJK Long Point Sharpener is perfect for long, strong pencil points. It's more compact than other long point sharpeners, and quicker to use because only one sharpening step is required. And the 531S is highly efficient, using up less of your pencil than other long point sharpeners.
NJK, a third-generation family business in Osaka, Japan, makes pencil sharpeners with sharp and consistent blades that produce better points, faster, with less breakage and friction. Their motto, "light as an apple peel, sharp as a Samurai sword," reflects the experience of gently twisting an NJK sharpener and watching long, continuous swirls of cedar peel gracefully from your pencil.
These simple, incredibly well-made products are the result of NJK's eighty years of history.
- Measures 1¾ × 1 × 2½ inches
- 1 replacement blade included
- Plastic
- Made in Japan